Chimney +250 DUSLO ŠAĽA – complete renovation of the stem, steel head gear, dump and exit chimney 21. March 2023 by ferix in SPECIAL BUILDINGS AND INSTALLATIONS, Uncategorized 0 Comment(s) Share:
Rehabilitation of the rocky slopes above the tunnel nr. 12 (27.600 km) and the tunnel nr. 13 (27.800 km) on the Banská Bystrica Dolná Štubňa railway line